The Cassiar property includes several underground mines which operated from 1979-2007 and collectively produced >315,000 oz Au from a series of high-grade veins. The project includes a 300 tpd gravity/flotation mill which was used during past operation, which is permitted for continued operation.

Veining occurs along a 15-km long mineralization trend.  Within this 15-km trend, many gold-bearing veins are known which have limited or no drilling, and no previous mining.

Updated Cassiar Property Map MAY 2022

 PAST PRODUCTION*

Veins Year Mined Tonnes Ave Grade Au g/t Oz Gold
Jennie-Maura-Alison-Bear (Main) 1979-1988 300,000 17.14 150,000
Eileen-Michelle-Lily (Cusac) 1986-1997 150,000 20.57 90,000
West Bain (Bain) 1993-1995 60,000 13.71 24,000
Vollaug (Vollaug) 1980-1997 170,000 10.29 50,000
Bear (Main) 1998  -  - 1,000
Rory (Main) 2006-2007 6,500 3.43 651
      15.76 315,651

*Cowley, 2017. NI43-101 Technical Report on the Cassiar Gold Property, British Columbia, Canada, for China Minerals Mining Corp, June 26, 2017, revised Oct. 2, 2017